When a missing component halts an assembly line
Ten workers cross their arms.
Eyes fixed on the forklift. One piece is missing, a single honeycomb wall panel to close the dinette of the bestselling camper. That component is buried in the warehouse and the line is blocked.
Every hour of downtime costs hundreds of euros.
The invisible cost of sorting: old logistics in camper production
Until a few years ago, furniture logistics followed a crude rule: produce and ship in bulk. Builders received huge crates with mixed pieces, workers lost hours unpacking, cataloging and moving individual elements to the stations.
A continuous cycle of internal sorting that doubled handling times. The result? Out of control costs and scratched panels even before final assembly.
Logistics bottlenecks in OEM warehouses
Storing wooden furniture for recreational vehicles requires precious square meters. The warehouse turns into an internal sorting and packaging center, which generates bottlenecks before the material arrives on the line: picking times lengthen and tracking single components becomes a full-time job.
Camper assembly line: the visual efficiency of continuous flow
Today, fitting out caravans and vans requires strict order. The assembly line must be clean and fluid: every component must arrive at the exact moment and in the right place. Without packaging on the floor, there are no forklifts running empty in the corridors.
How Borri’s sequenced kit delivery works
At Borri we solved the problem by rethinking supply according to the customer’s logistical needs. We do not just sell panels: we operate as an external department of your factory.
Since 1951, we combine the precision of curved wood with industrial capacity. We produce high-density lightweight honeycomb panels to lighten the vehicle and thermoformed Solid Surfaces for complex shapes.
Just-in-time logistics in camper production: from CAD to the line
With our integrated production and delivery, we eliminate floor sorting. We ship components in logistical kits dedicated to the single vehicle.
Each shipping cradle contains the pieces ordered for the assembly sequence. The first panel that the worker must install is at the top of the stack.
Zero searches, zero downtime.
Beyond the price of the panel: calculating the Total Cost of Ownership (TCO)
Often purchasing departments evaluate the supplier only on the price of the single panel, a partial calculation that hides the real process costs.
How much does the space occupied by pallets sitting to gather dust cost? How much does it cost to have a specialized worker search for a piece, or have him sand a scratched panel during sorting? And how much does a day of delay in the delivery of the finished camper cost?
How to zero downtime in camper production logistics
The real profitability is measured on the total process cost: bringing the furniture kit directly to the assembly line, without intermediate steps, eliminates pauses, zeroing storage, cancels handling damages and makes assembly times certain and constant.
Want to zero line stoppages and accelerate assembly?
Talk to Borri’s technicians. We analyze your requests to design a custom kit delivery system for your production.